Mixed Use

1021 Kingston’s Place

Client: Thorndike Development

1021 Kingston PlaceProvided civil engineering and permitting services for this large 40R mixed use project. Although this project was ultimately withdrawn, it consisted of regional infrastructure upgrades which Highpoint assisted in coordinating.

Included were:

– Upgrades to the Wastewater treatment plant

– Re-programming of the solid waste transfer station- Coordination with a potential several hundred foot high windmill

– Modifications to existing capped solid waste landfill

– Addition of a new highway slip ramp to mitigate traffic impacts

– Relocating overhead sub-transmission power lines

– Supplement stream base flow characteristics to Smelt Brook

– Coordination of financial commitments to install new public water supply well and upgrades to the water distribution system